Skip to content
Beaconby Winda
Offshore DevelopmentMonitoring

Stabroek Block

ExxonMobil-operated deepwater block offshore Guyana with four producing FPSOs; output near 0.9 Mb/d in 2026 and the fifth FPSO (Uaru, ~250,000 b/d) on station for a Q4 2026 start.

Record verified against agent research 2026-11-18 (World Oil); agent research 2026-11-17 (ExxonMobil; World Oil; Oil & Gas Journal). Tracked since 2026-10.

Coverage 4

  1. SBM Offshore to build Longtail's FPSO, which it says will have the highest gas handling of any FPSO

    ExxonMobil Guyana awarded SBM Offshore the build, installation and initial 10-year operation of the Longtail FPSO, designed for 1.2 bcf/d of gas and 250,000 b/d of condensate on SBM's tenth Fast4Ward hull, spread-moored in about 1,750 m of water. It is SBM's sixth FPSO for ExxonMobil in Guyana; the contract value was not disclosed.

    World Oil

  2. Uaru starts production through the Errea Wittu FPSO, lifting installed capacity to 1.1 million b/d

    The fifth Stabroek development started up through MODEC's Errea Wittu, designed for 250,000 b/d of oil and 540 MMcf/d of gas treatment, with the initial 250,000 b/d expected in the first quarter of 2027. The same day MODEC awarded Seatrium the integration of Hammerhead's FPSO, Essequibo 1899, due in 2029.

    ExxonMobilWorld OilOil & Gas JournalWorld Oil

  3. ExxonMobil takes $12.5 billion FID on Longtail, the block's first gas and condensate development

    Longtail, the eighth Stabroek development, uses an FPSO designed for 1.2 bcf/d of gas and up to 250,000 b/d of condensate from about 45 subsea wells, with start-up expected in 2030. Gas could be piped to shore subject to future investment decisions, market demand and infrastructure.

    World OilOil & Gas Journal

  4. Reinjection need of about 2 bcf/d may halve Guyana's first LNG project

    The Stabroek group told Guyana it expects to need about 2 bcf/d of gas for reinjection to meet crude targets, and Guyana may cut Fulcrum LNG's planned 6 mtpa floating project to start at up to 3 mtpa, two people close to the talks told Reuters. No decision has been made; ExxonMobil said it is working with Guyana on plans that maximize resource recovery.

    Reuters via BOE ReportOffshore Engineer

Beacon coverage 6